Specifications
Project: ST Georges Park Ditchling Road, Burgess Hill
Client: GallifordTry
System: Weber Pral M  Monocouche with ashlar cuts
Colour : Ivory
Construction: Medium Density Concrete blockwork
Application: Machine applied
Description : Weber Pral M scrape finish with ashlar cuts is a one-coat render, normally applied to a thickness of 20mm-25mm to allow for cutting back. (min 15mm after cutting back / max 10mm cut in 25mm render)
The finished thickness depends on site exposure The scrape textured surface is achieved by scratching the surface of the render before it has dried using a nail float. To achieve the ashlar effect the green mortar is cut back using special cutting tools guided by a timber straight edge set to line and level.