St George’s Park
Project: | ST Georges Park Ditchling Road, Burgess Hill |
Client: | GallifordTry |
System: | Weber Pral M Monocouche with ashlar cuts |
Colour : | Ivory |
Construction: | Medium Density Concrete blockwork |
Application: | Machine applied |
Description : | Weber Pral M scrape finish with ashlar cuts is a one-coat render, normally applied to a thickness of 20mm-25mm to allow for cutting back. (min 15mm after cutting back / max 10mm cut in 25mm render) The finished thickness depends on site exposure The scrape textured surface is achieved by scratching the surface of the render before it has dried using a nail float. To achieve the ashlar effect the green mortar is cut back using special cutting tools guided by a timber straight edge set to line and level. |